Sunday 26 January 2020

Description

In the process of designing, manufacturing, equipping, installing and commissioning power plants, the manufacturers pay adequate attention to the capacity measurement and performance testing of equipment based on the standards defined as the accuracy of all processes.
MAPNA Company, with several years of experience gained from the cooperation with international contractors, and the use of its experienced and skilled personnel as well as the use of up-to-date equipment and software, is capable of measuring the performance of equipment and systems of gas and combined-cycle power plants.
The measurement is in both separate and over-all forms. Hence, the company provides the employer with the relevant reports obtaining the approval of international organizations.
A total of 47 power plants have been authorized by the MAPNA Company to conduct initial performance testing or re-testing before and after upgrading and overhaul.

A total of 48 units of performance testing carried out in the form of 57 tests (retest, before or after upgrading)by the end of 2017